Birmingham Snow Hill
Birmingham Snow Hill railway station
Location
PlaceColmore Row, Birmingham
Local authorityCity of Birmingham
CoordinatesTemplate:Coord/display/inline,title
Operations
Station codeBSW
Managed byLondon Midland
Platforms in use3 National Rail
2 Midland Metro
Live arrivals/departures and station information
from National Rail
Annual rail passenger usage
2004/05 *  0.296 million
2005/06 *File:Decrease2.svg 0.294 million
2006/07 *File:Increase2.svg 1.939 million
2007/08 *File:Increase2.svg 2.407 million
2008/09 *File:Increase2.svg 4.158 million
Passenger Transport Executive
PTEWest Midlands
Zone1
History
1852Opened
1972Closed
1987Reopened
1999Midland Metro opened
National Rail - UK railway stations
Template:Hide in print
* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Birmingham Snow Hill from Office of Rail Regulation statistics.
Template:Portal frameless

Birmingham Snow Hill is a railway station and tram stop in the centre of Birmingham, England on the site of a much larger station which was built by the former Great Western Railway (GWR). It is the second most important railway station in the city, after the former LMS Birmingham New Street station. It is also the terminus of the Midland Metro light rail line from Wolverhampton (via Wednesbury and West Bromwich), pending the line's extension.

The present Snow Hill station has three platforms for National Rail trains. When it was originally reopened in 1987 it had four, but one was later converted for use by Midland Metro trams. The planned extension of the Midland Metro through Birmingham city centre includes a dedicated embankment for trams alongside the station, and this will allow the fourth platform to be returned to main-line use.

History[]

The site of the station was originally occupied by Oppenheims Glassworks. This was demolished, but many parts of the building and machinery are believed to be buried underneath the station and car park, and during recent development work alongside the station the area was designated as a site of archaeological importance by Birmingham City Council. The station was opened in 1852 on the Great Western Railway (GWR) line from London (Paddington) to Wolverhampton Low Level. It was originally called Livery Street Station and was a simple large wooden shed. It was renamed Snow Hill in 1858, and the Great Western Hotel was added in 1863. By 1859 it was possible to travel from Snow Hill to London in just under three hours.

File:Birmingham Snow Hill (early 1900s).jpg

The facade of the original Snow Hill, demolished in 1977

File:Birmingham Snow Hill 2 railway station1803193 dda9f748.jpg

View on Colmore Row of main entrance in 1962

File:Old Snow Hill 1803151.jpg

Old Snow Hill station in the 1950s

Snow Hill had a new station which had a huge arched roof of iron and glass, with a simple wooden overhead bridge linking the two platforms. It was never intended to be the main station, but political gaming between the railway companies prevented the railway reaching its original intended terminus at Birmingham Curzon Street.

Trains from the south arrived through Snow Hill Tunnel, built by the cut-and-cover method, and in a cutting from Temple Row to Snow Hill. The cutting was roofed over in 1872 and the Great Western Arcade built on top.

In 1906 reconstruction of Snow Hill began, completed in 1912. The new station building was intended to compete with New Street, which at the time was a much grander building than it is today. The rebuilt station had a large booking hall with an arched glass roof. It contained lavish waiting rooms with oak bars. The bottom end of the station had fish platforms (Birmingham was and still is a major participant in the seafood industry)Template:Huh and goods storage. The station was twice as long as the current one, with eight through platforms and four bay platforms. Although the line through the tunnel has always been double track, the line towards The Hawthorns was a four-track main line. Because of capacity problems towards London, Moor Street station was built at the opposite end of the tunnel to take local trains towards Leamington Spa and Stratford upon Avon.

At its height, many trains that now run into New Street station used to run into Snow Hill, along with some that no longer run. Services included:

  • Shrewsbury, Chester and Mid Wales – these trains now run into New Street, although it is now possible to join a train to Smethwick Galton Bridge and change on to the new hourly ARRIVA Trains Wales service.
  • Birkenhead – this was on the old GWR route from London Paddington. British Rail ended this service prior to Snow Hill closing in 1968.
  • Cardiff Central via Hereford.
  • Bristol, Exeter, Plymouth & Penzance via Stratford upon Avon – was the GWR trunk route. Beeching closed the line between Stratford and Cheltenham Spa. All services now run through New Street and via Bromsgrove.
  • Wolverhampton Low Level & Dudley – these services were cut entirely in 1972. The Midland Metro tram line runs on this route to Wolverhampton, but with more stops.
  • London Paddington – service transferred to New Street in 1967. Virgin Trains retained a limited service past the BR era until they cut the services entirely just before the Voyager trains were introduced. The London service was restored in the early 1990s, but now to London Marylebone - making this Snow Hill's only long-distance service.

Closure[]

During the electrification of the West Coast Main Line, Snow Hill handled most of New Street's traffic, but the subsequent Beeching Axe closure programme in the 1960s took the view that Snow Hill station was unnecessary, and all services were switched to Birmingham New Street and Moor Street.

File:Snow Hill Station original.jpg

An original entrance in Livery Street

Express services were diverted to New Street from 1967. Local services north from Snow Hill to Wolverhampton Low Level railway station, and four trains per day to Langley Green via Smethwick West using Class 122 units nicknamed bubble cars were the last to run and ended in March 1972.

Despite a public outcry the Snow Hill building was not preserved. The Great Western Hotel was demolished in 1969 and the station was largely demolished in 1977, when the dangerous state of the building was revealed. However, it did enjoy a brief moment of fame when it was the setting for a fight scene in the locally-set (and Play for Today-based) BBC TV drama series Gangsters.The ironwork of the station roof was badly corroded in several places, and the unstable ground and foundations on which the station had been built were causing it to slide downhill.

A few items including the original gates and booking hall sign were saved and later used in the Birmingham Moor Street railway station restoration. The site was for many years used as a car park.

Rebirth[]

File:Birmingham Snow Hill railway station entrance - DSC08832.JPG

Station entrance

File:MM tram at Snow Hill.jpg

A Midland Metro tram at Snow Hill

In the mid 1980s British Rail decided to re-open Snow Hill station as part of the cross-city transport plan for Birmingham.

In 1987 the newly rebuilt station opened for services to the south, with some of the remaining parts of the original station lost (e.g. the old parcels office, some platforms and the mosaic floor from former waiting rooms) and others incorporated (notably the now-sealed entrance, with GWR crest, in Livery Street). Services to London were restarted, along with many local services; the London services, however, were routed to Marylebone instead of the pre-closure destination of Paddington. Services at Moor Street, at the southern end of Snow Hill tunnel, were switched from the former terminal platforms, which then closed, onto the two through platforms to become a through station adjacent to the tunnel mouth.

The new Snow Hill station, with a multi-storey car park above, has been widely criticised as draughty, unwelcoming and architecturally unimaginative[citation needed]. The car park was designed by Seymour Harris Partnership.

On 24 September 1995, services north to Smethwick and onwards to Worcester resumed. The first day saw steam-hauled special trains to Stourbridge Junction.

In 1999, the line to Wolverhampton was re-opened as a light-rail (tram) line, the Midland Metro.

Work on a new entrance on Livery Street to give commuters access to the lower Snow Hill part of the City Centre commenced in 2005 and was due to complete in January 2007. The work had a projected cost of £9.94 million, but due to Central Trains' failing to apply for planning permission, and severe technical difficulties, the cost rose to at least £17 million.[1] Although still under wraps, the project appeared to be complete at start of 2010, with functioning display equipment and platform doors that open as one approaches (access prevented by barriers). Legal wrangles between London Midland, Network Rail and Centro, continue to prevent the opening which still has no date in sight.[1]

Future[]

New platforms for the Midland Metro are due to be built as part of its City Centre Extension to New Street Station,[2] part-funding for which was confirmed in the October 2010 Comprehensive Spending Review.[3] A new viaduct has been built alongside the station as part of the Snowhill development to carry the tram lines into the city centre.[2] The project is scheduled for completion in 2015.[4]

Services[]

Typical off-peak weekday service is as follows, in trains per hour (tph):[5]

Long-distance services[]

Snow Hill is the principal destination of the Chiltern Main Line, which links Birmingham with London Marylebone, operated by Chiltern Railways, with some Chiltern services continuing beyond Birmingham to Kidderminster.

Local services[]

Local services from Snow Hill, as with most other local services in the West Midlands, are supported by Network West Midlands, the West Midlands Passenger Transport Executive. They are operated by London Midland and mostly by Class 150 diesel multiple units (DMU). The Class 150 units are due to be replaced with new Class 172 DMUs during 2010. Until 2005 there was an hourly local train to Leamington Spa. This was cut back to peak times only and the rest of the local services beyond Dorridge are now run by Chiltern Railways. There is also an occasional service to Stratford upon Avon via Dorridge.

  • 3tph to Whitlocks End:
of which 1tph continues to Stratford upon Avon
  • 3tph to Dorridge
  • 6tph to Stourbridge Junction:
of which 4tph continue to Kidderminster:
of which 2tph continue to Worcester
  • Services to Dorridge run 5 times per hour if you include the London service.
  • Services beyond Worcester, to Malvern and Hereford are non standard, generally 1 per hour.

See also[]

Bibliography[]

  • Boynton, John (2001). Main Line to Metro: Train and Tram on the Great Western Route: Birmingham Snow Hill — Wolverhampton. Kidderminster: Mid England Books. ISBN 9780952224891
  • Harrison, Derek (1978). Salute to Snow Hill: The Rise and Fall of Birmingham's Snow Hill Railway Station 1852 - 1977. Birmingham: Barbryn Press. ISBN 9780906160008

References[]

  1. 1.0 1.1 Template:Cite news
  2. 2.0 2.1 Template:Cite news
  3. Template:Cite news
  4. Template:Cite news
  5. London Midland — Timetables.

External links[]

Template:Commons category

Template:Start Midland Metro box Template:Tram line |- ! colspan="5" | National Rail National Rail |- style="text-align: center;" | style="border-top:solid 1px gray; "| Birmingham Moor
Street
| style="background:#76B41F; border-top:solid 1px gray; " |   | style="text-align: center; border-top:solid 1px gray; "|London Midland
Leamington-Worcester | style="background:#76B41F;border-top:solid 1px gray; " |   | style="border-top:solid 1px gray; "|Jewellery Quarter |- style="text-align: center;" | style="border-top:solid 1px gray; "| Birmingham Moor
Street
| style="background:#000080; border-top:solid 1px gray; " |   | style="text-align: center; border-top:solid 1px gray; "|Chiltern Railways
London-Birmingham | style="background:#000080;border-top:solid 1px gray; " |   | style="border-top:solid 1px gray; "|Terminus |- style="text-align: center;" | style="border-top:solid 1px gray; "| Birmingham Moor
Street
| style="background:#000080; border-top:solid 1px gray; " |   | style="text-align: center; border-top:solid 1px gray; "|Chiltern Railways
London-Kidderminster | style="background:#000080;border-top:solid 1px gray; " |   | style="border-top:solid 1px gray; "|Jewellery Quarter |- style="text-align: center;" | style="border-top:solid 1px gray; "| Birmingham Moor
Street
| style="background:#800000; border-top:solid 1px gray; " |   | style="text-align: center; border-top:solid 1px gray; "|Vintage Trains
The Shakespeare Express
July-September
| style="background:#800000;border-top:solid 1px gray; " |   | style="border-top:solid 1px gray; "|Terminus |- ! colspan="1" | ! colspan="3" | Disused railways ! colspan="1" |

|- style="text-align: center;" | style="border-top:solid 1px gray; "| Terminus | style="background:#8f691e; border-top:solid 1px gray; " |   | style="text-align: center; border-top:solid 1px gray; "|Great Western Railway
Birmingham Wolverhampton (1854-1972) | style="background:#8f691e;border-top:solid 1px gray; " |   | style="border-top:solid 1px gray; "|Hockley |}

Template:BirminghamBuildings

nl:Station Birmingham Snow Hill ja:バーミンガム・スノーヒル駅

Advertisement