UK Transport Wiki
Register
Advertisement

Template:EngvarB Template:Good article

High Speed 1
Template:Px

High Speed 1 approaching the Medway Viaducts.

Overview
TypeHigh-speed rail
Freight rail[1]
StatusOperational
LocaleUnited Kingdom (Greater London
South East England)
TerminiLondon St Pancras
Channel Tunnel
Stations4
Operation
Opened2003 (Section 1)
2007 (Section 2)
OwnerLondon & Continental Railways
Operator(s)Eurostar, Southeastern, DB Schenker
Rolling stockClass 395
Class 373/1
Class 92 (from 2010)[2]
British Rail MPV
Eurotunnel Class 0001
Technical
Line length108 km (Template:Convert/mi)
No. of tracksDouble track throughout
Track gauge{{#switch:sg
|3mm=3 mm (0.118 in)
|4mm=4 mm (0.157 in)
|4.5mm=4.5 mm (0.177 in)
|4.8mm=4.8 mm (0.189 in)
|6.5mm=6.5 mm (0.256 in)
|6.53mm=6.53 mm (0.257 in)
|8mm=8 mm (0.315 in)
|8.97mm=8.97 mm (0.353 in)
|9mm=9 mm (0.354 in)
|9.42mm=9.42 mm (0.371 in)
|10.5mm=10.5 mm (0.413 in)
|11.94mm=11.94 mm (0.470 in)
|12mm=12 mm (0.472 in)
|12.7mm=12.7 mm (0.5 in)
|13mm=13 mm (0.512 in)
|13.5mm=13.5 mm (0.531 in)
|14mm=14 mm (0.551 in)
|14.125mm=14.125 mm (0.556 in)
|14.2mm=14.2 mm (0.559 in)
|14.28mm=14.28 mm (0.562 in)
|14.3mm=14.3 mm (0.563 in)
|15.76mm=15.76 mm (0.620 in)
Loading gaugeUIC GC[6]
Electrification25 kV 50 Hz OHLE
Operating speed300 km/h (Template:Convert/outsep)
230 km/h (Template:Convert/outsep)[3][4][5]

High Speed 1 (HS1), officially known as the Channel Tunnel Rail Link (CTRL) and originally as the Continental Main Line (CML), is a Template:Convert/LoffAoffDbSon high-speed railway line running from London through Kent to the British end of the Channel Tunnel.

The line was built to carry international passenger traffic from the United Kingdom to Continental Europe; additionally it carries domestic passenger traffic to and from towns and cities in Kent, and has the potential to carry Berne gauge freight traffic. The completed line, crossing over the River Medway and underneath the River Thames to London St Pancras railway station, opened on 14 November 2007.[7] The line allows speeds of Template:Convert/to and cost £5.2bn to build.[8] There are intermediate stations at Stratford International, Ebbsfleet International and Ashford International.

International passenger services are currently provided by Eurostar, with journey times of London St Pancras to Paris Gare du Nord in 2 hours 15 minutes, and from St Pancras to Brussels-South in 1 hour 51 minutes,[9] using a fleet of 27 Class 373/1 multi-system trains capable of Template:Convert/LoffAoffDbSoff. Other, competing, passenger operators are expected to use the line in future.

Domestic high-speed commuter services serving the intermediate stations and beyond began on 13 December 2009. The fleet of 29 Class 395 passenger trains are permitted to reach speeds of Template:Convert/LoffAoffDbSoff.[10]

Intermodal freight trains are expected to start running at night on the line by the end of 2010, linking the Channel Tunnel with Barking and operated by DB Schenker using Class 92 locomotives.[11]

The CTRL project had been one of the United Kingdom's largest civil engineering projects, encompassing many new bridges and tunnels with a combined length nearly as long as the Channel Tunnel itself. During construction of the CTRL, significant archaeological research was undertaken.[12] In 2002, the CTRL project was awarded the "Major Project Award" at the British Construction Industry Awards.[13] The CTRL has seen periods of financial difficulties and the line was transferred to government ownership in 2009, with a 30-year concession for operation of the line being put up for sale in June 2010.[14] The concession was awarded to a consortium of Borealis Infrastructure and Ontario Teachers' Pension Plan in November 2010.[15]

Early history[]

Template:See A high-speed rail line, LGV Nord, has been in operation between the Channel Tunnel and the outskirts of Paris since the Tunnel's opening in 1994.[16] This has enabled Eurostar rail services to travel at 300 km/h (186 mph) for this part of their journey. A similar high-speed line in Belgium, from the French border to Brussels, HSL 1, opened in 1997.[17][18] However, in Britain, Eurostar trains had to run at a maximum of 160 km/h (100 mph) on existing tracks between London, Waterloo and the Channel Tunnel.[19] These tracks were shared with local traffic, limiting the number of services that could be run, and jeopardising reliabiilty.[20] The case for a high-speed line similar to the continental part of the route was recognised by policymakers,[21] and the construction of the line was authorised by Parliament with the Channel Tunnel Rail Link Act 1996,[22] which was amended by the Channel Tunnel Rail Link (Supplementary Provisions) Act 2008.[23][24]

The original plan for the Channel Tunnel Rail Link involved a tunnel reaching London from the south-east, and an underground terminus in the vicinity of Kings Cross station. However a late change in the plans, principally driven by the then Deputy Prime Minister Michael Heseltine's desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing the underused St Pancras station as the terminus, with access via the North London Line that crosses the throat of the station.[25]

The idea of using the North London line proved illusory, and it was rejected in 1994 by the then Transport Secretary, John MacGregor, as too difficult to construct and environmentally damaging.[26] However, the idea of using St Pancras station as the core of the new terminus was retained, albeit now linked by 20 km (12 miles) of specially built tunnels to Dagenham via Stratford.[25]

London and Continental Railways (LCR) was chosen by the UK government in 1996 to build the line and to reconstruct St Pancras station as its terminus, and to take over the British share of the Eurostar operation, Eurostar (UK). The original LCR consortium members were National Express Group, Virgin Group, S. G. Warburg & Co, Bechtel and London Electric.[27][28] While the project was under development by British Rail it was managed by Union Railways, which became a wholly-owned subsidiary of LCR. On 14 November 2006, LCR adopted High Speed 1 as the brand name for the completed railway.[29] Official legislation, documentation and line-side signage, however, have continued to refer to "CTRL".

The project[]

As the 1987 Channel Tunnel Act made government funding for a Channel tunnel rail link unlawful,[30] construction did not take place as it was not financially viable. Construction was delayed until passage of the Channel Tunnel Rail Link Act 1996[22] which provided construction powers that ran for the following 10 years.

The whole route was to be have been built as a single project, but in 1998 serious financial difficulties arose, and extensive changes came with a British government rescue plan. [31] To reduce risk, the line was split into two separate phases,[32] to be managed by Union Railways (South) and Union Railways (North). A recovery programme was agreed whereby LCR sold government-backed bonds worth £1.6 billion to pay for the construction of section 1, with the future of section 2 still not settled.

The original intention had been for the new railway, once completed, to be run by Union Railways as a separate line from the rest of the British railway network. However, as part of the 1998 rescue it was agreed that, following completion, section 1 would be purchased by Railtrack with an option to purchase section 2. In return, Railtrack was committed to operate the whole route as well as St Pancras railway station, which, unlike all other former British Rail stations, was transferred to LCR/Union Railways in 1996.[33]

In 2001, Railtrack announced that, due to its own financial problems, it would not undertake to purchase section 2,[34][35][36] triggering a second restructuring.[37] The 2002 plan agreed that the two sections would have different owners (Railtrack for section 1, LCR for section 2) but with common Railtrack management. Following further financial problems at Railtrack,[38] its interest was sold back to LCR, who then sold the operating rights for the completed line to Network Rail, Railtrack's successor.[39] Under this arrangement LCR became the sole owner of both sections of the CTRL and the St Pancras property, as per the original 1996 plan. Amendments were made in 2001 for the new station at Stratford International and connections to the West Coast Main Line.

As a consequence of the restructuring, the LCR consortium is, Template:As of, construction firms Arup, Bechtel, Halcrow and Systra (who form Rail Link Engineering (RLE)), transport operators National Express Group and SNCF (who operate the Eurostar (UK) share of the Eurostar service with the National Railway Company of Belgium and British Airways), electricity company EDF and UBS Investment Bank. On completion of section 1 by RLE, the line was handed over to Union Railways (South), who then handed it over to London & Continental Stations and Property (LCSP), who are the long-term owners of the line. Once section 2 of the line had been completed it was handed over to Union Railways (North), who handed it over to LCSP. The entire line, including St Pancras, is managed, operated and maintained by Network Rail.

In February 2006 there were rumours that a 'third party' (believed to be a consortium headed by banker Sir Adrian Montague) had expressed an interest in buying out the present partners in the project.[40] LCR shareholders rejected the proposal,[41] and the government, who effectively could overrule shareholders' decisions as a result of LCR's reclassification as a state-owned body,[42] decided that discussions with shareholders would not take place imminently, effectively backing shareholders' views on the proposed takeover.[41]

By May 2009 LCR had become insolvent and the government received agreement to use state aid to purchase the line and also to open it up to competition to allow other services to use it apart from Eurostar.[43] On 12 October 2009 a proposal to sell £16 billion of state assets including the Channel Tunnel rail link in the following two years to cut UK public debt was announced.[44] The award of a 30-year concession to a consortium of Canadian investors was announced on 5 November 2010.[15]

Route[]

File:Eurostar on CTRL.jpg

A Eurostar train on the CTRL, near Ashford

Section 1[]

Section 1 of the Channel Tunnel Rail Link, opened on 28 September 2003, is a 74 km (46 mile) section of high-speed track from the Channel Tunnel to Fawkham Junction in north Kent. The section's completion cut the London–Paris journey time by around 21 minutes, to 2h 35mn. The line includes the Medway Viaduct, a 1.2 km (¾ mile) bridge over the River Medway and the North Downs Tunnel, a 3.2 km (2 mile) long, 12 m (40 ft) diameter tunnel. In safety testing on the section prior to opening, a new UK rail speed record of 334.7 km/h (208.0 mph) was set.[45] Much of the new high-speed line runs alongside the M2 and M20 motorways through Kent. After completion, Eurostar trains continued to use suburban lines to enter London, arriving at Waterloo International.

There were a number of deaths of employees working on the CTRL over the construction period. A death occurred on Friday 28 March 2003 near Westernhanger, Folkestone where a worker came into contact with the energised power supply.[46] Another death occurred two months later, in May 2003, when a scaffolder fell seven metres at Thurrock, Essex.[47] This death resulted in three companies being found guilty of breaching health and safety legislation, omitting to provide barriers, which resulted in Deverson Direct Ltd being ordered to pay a fine of £50,000, J Murphy and Sons Ltd were fined £25,000, and Hochtief Aktiengesellschaft another £25,000.[47] Two more deaths relate to a fire onboard a train carrying wires, one mile inside a tunnel under the Thames between Swanscombe, Kent, and Thurrock, Essex on Tuesday 16 August 2005. The train shunter died at the scene[48] and the train driver later died in hospital on 20 August 2005.[49] It has been suggested that a large amount of blame for accidents throughout the project lay with individual behaviour, becoming such a problem an internal programme was launched to tackle behaviour problems during the construction.[50]

Section 2[]

File:KingsCrossDevelopmentModel.jpg

Model showing the current redevelopment of the King's Cross area with the new extension to the barrel-vaulted St Pancras Station on the left

Section 2 of the project opened on 14 November 2007 and is a 39.4 km (24 mile) stretch of track from the newly built Ebbsfleet station in Kent to London St Pancras. Completion of the section cut journey times by a further 20 minutes (London–Paris in 2h 15m; London–Brussels in 1h 51m). The route starts with a 2.5-kilometre (1.5 mi) tunnel which dives under the Thames on the edge of Swanscombe, then runs alongside the London, Tilbury and Southend Railway as far as Dagenham, where it enters a 19-kilometre (12 mi) tunnel (51°31′36.9″N 0°8′13.9″E / Expression error: Unrecognized punctuation character "[". Expression error: Unrecognized punctuation character "[". / Template:Coord/dms2dec; Template:Coord/dms2dec), before emerging over the East Coast Main Line near St Pancras. The tunnels are divided into London East and London West sections, between which a 1-kilometre stretch runs close to the surface to serve Stratford International and the Temple Mills Depot.

The new depot at Temple Mills, to the north of Stratford, replaced the North Pole depot in the west of London.[51] In testing, the first Eurostar train ran into St Pancras on 6 March 2007.[52] All CTRL connections are fully grade-separate. This is achieved through use of viaducts, bridges, cuttings and in one case, the tunnel portal itself. Along the route, several key and unique design features have emerged.

Unlike normal LGV stations in France, the through tracks for Ashford International railway station are off to one side rather than going through, partly due to Ashford International predating the line.[53] High Speed 1 approaches Ashford International from the north in a cut-and-cover "box"; the south-bound line rises out of this cutting and crosses over the main tracks to enter the station. The main tracks then rise out of the cutting and over a flyover. On leaving Ashford, southbound Eurostars return to the high speed line by travelling under this flyover and joining from the outside. The international platforms at Ashford are supplied with both overhead 25 kV and 3rd rail 750V, avoiding the need to switch power-supplies.

Stations[]

Ashford International[]

Main article: Ashford International railway station

This station was rebuilt as Ashford International during the early 1990s for international services from mainland Europe; this included the addition of two platforms to the north of station (the original down island platform had been taken over by international services). Unlike normal LGV stations in France, the through tracks for Ashford International railway station are off to one side rather than going through.[53] The number of services was reduced after the opening of the Ebbsfleet station. A high-speed domestic service operated by Southeastern to London St Pancras began on 29 June 2009.

Ebbsfleet International[]

Main article: Ebbsfleet International railway station

Ebbsfleet International railway station in the borough of Dartford, Kent is 10 miles outside the eastern boundary of Greater London and opened to the public on 19 November 2007.[54] and is now Eurostar's main station in Kent.[55][56][57] Two of the platforms are designed for Eurostar trains and four for high-speed domestic services.[58]

St Pancras International[]

Main article: St Pancras railway station
File:Eurostar at St Pancras railway station.jpg

Eurostar train at St Pancras International Railway Station

The terminus for the high-speed line in London is St Pancras railway station. During the 2000s, towards the end of the construction of the CTRL, the entire station complex was renovated, expanded and rebranded as St Pancras International,[59][60] with a new security-sealed terminal area for Eurostar trains to continental Europe.[61] In addition, it retained traditional domestic connections to the north and south of England. The new extension doubled the length of the central platforms now used for Eurostar services; new platforms have been provided for existing domestic East Midlands Trains and the Southeastern high-speed services that run along High Speed 1 to Kent.[62] New platforms on the Thameslink line across London were built beneath the western margins of the station, and the station at King's Cross Thameslink was closed.

A complex junction has been built north of St Pancras with connections to the East Coast Main Line, North London Line (for West Coast Main Line) and Midland Main Line, allowing for a wide variety of potential destinations albeit on conventional rails. As part of the works, tunnels connecting the East Coast Main Line to the Thameslink route were also built in readiness for the forthcoming Thameslink Programme.

Stratford International[]

Main article: Stratford International railway station

Stratford International railway station was not part of the original government plans for the CTRL.[63] Completed in April 2006, it opened on the 30 November 2009 when the domestic preview Southeastern highspeed services started stopping here.[64] An extension of the Docklands Light Railway is planned to open early 2011. It will also be the railway station for the main site where the 2012 Summer Olympics will be held.[65]

Temple Mills Depot in Leyton is used for storage and servicing of Eurostar trains and off peak berthing of Class 395 Southeastern high speed trains.

Infrastructure[]

The railway is maintained from Singlewell Infrastructure Maintenance Depot.

Track[]

Both track and signalling technology (TVM-430 + KVB) are based on or identical to the standards used on the French LGV high-speed lines. The areas around St Pancras and Gare du Nord use KVB signalling with the whole of the high-speed route to Paris (CTRL, Channel Tunnel, LGV Nord) using TVM-430. Signalling tests before opening were performed by the SNCF-owned "Lucie" test car.[66]

The track is {{#switch:sg

|3mm=3 mm (0.118 in)
|4mm=4 mm (0.157 in)
|4.5mm=4.5 mm (0.177 in)
|4.8mm=4.8 mm (0.189 in)
|6.5mm=6.5 mm (0.256 in)
|6.53mm=6.53 mm (0.257 in)
|8mm=8 mm (0.315 in)
|8.97mm=8.97 mm (0.353 in)
|9mm=9 mm (0.354 in)
|9.42mm=9.42 mm (0.371 in)
|10.5mm=10.5 mm (0.413 in)
|11.94mm=11.94 mm (0.470 in)
|12mm=12 mm (0.472 in)
|12.7mm=12.7 mm (0.5 in)
|13mm=13 mm (0.512 in)
|13.5mm=13.5 mm (0.531 in)
|14mm=14 mm (0.551 in)
|14.125mm=14.125 mm (0.556 in)
|14.2mm=14.2 mm (0.559 in)
|14.28mm=14.28 mm (0.562 in)
|14.3mm=14.3 mm (0.563 in)
|15.76mm=15.76 mm (0.620 in)[6] cleared to a larger modern European GC loading gauge[6] enabling GB+ gauge freight as far as the yards at Barking.[67][68] The line is electrified entirely using overhead lines with 25 kV AC railway electrification.

Tunnels[]

After local protests,[69][70] early plans were modified to put more of the route into tunnels up until a point approximately Template:Convert/mi from St. Pancras, previously the CTRL was planned to run on an elevated section alongside the North London Line on approach into the line's terminus. The twin tunnels bored under London were driven from Stratford westwards towards St Pancras, eastwards towards Dagenham and from Dagenham westwards to connect with the tunnel from Stratford. The tunnel boring machines were 120 metres long and weighed 1,100 tonnes. The depth of the tunnels vary from a depth of 24 metres to 50 metres.

The construction works were complex and a large number of contractors were involved in delivering them.[71] The CTRL Section 2 construction works had caused considerable disruption around the Kings Cross area of London, however in their wake redevelopment was stimulated.[72][73] The huge redevelopment area includes the run-down areas of post-industrial and ex-railway land close to King's Cross and St Pancras, a conservation area with many listed buildings; this was promoted as one of the benefits for building the CTRL.[74] However it has been postulated that this development was actually suppressed by the construction project,[75] and some of the affected districts are still in a poor state.[76]

Connection line to Waterloo[]

A Template:Convert/LoffAoffDbSon connecting line providing access for Waterloo railway station leaves High Speed 1 at Southfleet Junction using a grade-separated junction; the main CTRL tracks continue uninterrupted through to CTRL Section 2 underneath the southbound flyover. The connection joins the Chatham Main Line at Fawkham Junction with a flat crossing. The retention of Eurostar services to Waterloo after the line to St Pancras opened was ruled out on cost grounds.[77] Waterloo International closed upon opening of the section two of the CTRL in November 2007; Eurostar now serves the refurbished St Pancras as its only London terminal, so this connecting line is no longer used.[78][79]

Operators[]

Eurostar[]

File:StroodCTRL2.JPG

A Eurostar train passing Strood, on approach to the Medway bridge

Main article: Eurostar

The Eurostar service uses about 40% of the capacity of High Speed 1,[80] which in November 2007 became the company's route for all its services.[81] Eurostar trains are for international traffic only, passing along the high-speed line from London St Pancras railway station to the Channel Tunnel, terminating at either Paris Gare de Nord in France or Brussels Midi-Zuid in Belgium.[82][83] Currently the trains operated by Eurostar are the only ones to make full use of the high speeds on the line; a Eurostar train was used to set a new British rail speed record of 334.7 km/h (Template:Convert/outsep) on 30 July 2003.[84][85] The British component of Eurostar is owned by London and Continental Railways, which also owns High Speed 1 and the infrastructure on it.[86]

On 4 September 2007, a train travelled from Paris Gare du Nord to St. Pancras in 2 hours 3 minutes and 39 seconds.[87] On 19 September 2007, a train travelled from Brussels South to St. Pancras in 1 hour 43 minutes.[88]

 Class  Image  Type   Top speed   Number   Routes operated   Built 
 mph   km/h 
Class 373 Eurostar File:Eurostar at St Pancras railway station.jpg Electric multiple unit 186 300 28 LondonParis
London–Brussels
London–Marne-la-Vallée – Chessy
London–Avignon Centre
London–Bourg Saint Maurice
1992

Southeastern[]

File:Class 395 Javelin STP 003.jpg

A Southeastern Class 395 train departing from London St Pancras railway station on a preview domestic service

Main article: Southeastern (train operating company)

Domestic high-speed services on High Speed 1 are operated by Southeastern. Having been in planning since 2004,[89] a preview service of the British Rail Class 395 trains, popularly known as Javelins, started in June 2009,[58] and regular services began on 13 December 2009. The quickest journey time from Ashford to London St Pancras is 35 minutes,[90] compared with 60 minutes for the service to London Charing Cross via Tonbridge.[91] This service on Section 2 of the CTRL, known previously as CTRL-DS, was a factor in London's successful 2012 Olympic Bid, promising a seven-minute journey time from the Olympic Park at Stratford to the London terminus at St Pancras.[92] Although much of the route is cleared for 300 km/h (Template:Convert/outsep), the normal speed of the Class 395 is limited to 200 km/h (Template:Convert/outsep) with its maximum 225 km/h (Template:Convert/outsep) being used only to make up time in the event of delay.[93] However, these trains have faster acceleration than Eurostar TGV 373000 units.[94]

 Class  Image  Type   Top speed   Number   Routes operated   Built 
 mph   km/h 
Class 395 Javelin File:Class 395 Javelin STP 001.jpg Electric multiple unit 140 225 29 St PancrasStratford International-
Ebbsfleet International-Ashford International-Ramsgate/ Dover Priory.[95]
2007

DB Schenker[]

File:Blubellhill.jpg

CTRL North Downs Tunnel, country portal under Blue Bell Hill

Main article: DB Schenker

DB Schenker is a global freight operator with a large interest in freight over rail in Europe.[96] While High Speed 1 was constructed with freight loops, no freight traffic had run upon the line since opening in 2003.[97] On 16 April 2009 DB Schenker signed an agreement with HS1 Ltd, the owner of High Speed 1, for a partnership to develop TVM modifications for class 92 freight locomotives to run upon the line.[98] Freight services are expected to begin early in 2010, after the signalling technology is made available to all potential operators,[98] and the necessary logistics and support infrastructure to serve freight operations.[99]

 Class  Image  Type   Top speed   Number   Built 
 mph   km/h 
Class 92 File:92027 George Eliot at Stafford.jpg Electric locomotive 87 140 46 1993

Future operations[]

At present, only Deutsche Bahn has applied for use of the line and in 2009 regulations were relaxed to allow its trains to use the tunnel. Other proposals are yet to be formalised.

Deutsche Bahn[]

File:SiemensVelaroD-InnoTrans2010.jpg

Deutsche Bahn is planning services using Siemens Velaro D trains and a sixteen-car version has been ordered by Eurostar

In November 2007, it was reported that Deutsche Bahn, Germany's national train company, had applied to use the Channel Tunnel and High Speed 1 into London.[100] This was denied by Deutsche Bahn, and the bi-national Channel Tunnel Safety Authority confirmed that it had not received such an application.[101] The plan was delayed by safety regulations as Deutsche Bahn's fleet of ICE 3M high-speed trains could not be divided in the tunnel in an emergency.[102]

In December 2008, it was reported that Deutsche Bahn (DB) was interested in buying the British share in Eurostar,[103] which in practice means buying Eurostar (U.K.) Ltd., the 100% subsidiary of London and Continental Railways (LCR), which the British government intends to break up and sell just as it does the other rail-related subsidiary of L&CR, High Speed 1.[104][105] The buyer of EUKL would become the owner of the 11 British "Three Capitals" Class 373 trainsets plus all seven "North of London" sets, and would also be responsible for the operations of Eurostar traffic within Britain once the management contract with ICRR expires in 2010. Guillaume Pépy, the president of SNCF, who held a press conference the same day, described DB's interest as "premature, presumptuous and arrogant".[106] SNCF claims to own 62% of the shares of Eurostar Group Ltd. Hartmut Mehdorn, former CEO of Deutsche Bahn, confirmed DB's interest but insisted in a letter to Pépy that DB had only informally requested information and not made any official requests to Britain's Department for Transport.[107]

In 2009, Eurotunnel (the owners of the Channel Tunnel) announced that it was prepared to start relaxing the fire safety regulations, in order to permit other operators, such as Deutsche Bahn, to transport passengers via the Tunnel using other forms of rolling stock.[108] Under the deregulation of European railway service, high-speed lines were opened up to access by other operators on 1 January 2010; the Inter-Governmental Commission on the Channel Tunnel (IGC) announced that it was considering relaxing the safety requirements concerning train splitting. LCR suggested that high-speed rail services between London and Cologne could commence before the 2012 Olympics.[109]

In March 2010 Eurotunnel, High Speed 1, DB and other interested train operators formed a working group to discuss changes to the safety rules, including allowing 200-metre trains. The Intergovernmental Commission currently requires trains to be 400m long.[110] Deutsche Bahn carried out evacuation trials in the tunnel on 17 October 2010 with two 200m-long ICE3 trains, and displayed one of them at St Pancras railway station on 19 October.[111] The current Velaro ICE3 sets do not meet the fire safety requirements for passenger services through the tunnel, but the Siemens Velaro D sets on order include the necessary additional fire-proofing.[112] DB is planning a regular service to Frankfurt (5h from London), Rotterdam (3h) and Amsterdam (4h) via Brussels from 2013[111] or a little earlier in time for the 2012 Olympics.[113][114]

File:Alstom AGV Cerhenice img 0365.jpg

Veolia's planned use of the AGV train would cut journey times to London

Veolia[]

In September 2008, Air France-KLM indicated a desire to take advantage of the change in the law and apply to run rail services, in cooperation with Veolia, from London to Paris and from Paris to Amsterdam in competition with Eurostar and Thalys, respectively, with the intention of purchasing or leasing a number of the new AGV multiple units currently being tested.[115][116] However, in October 2009 Air France withdrew its interest. This led to Veolia looking for new partners, with the announcement that it would begin working on new proposals in cooperation with Trenitalia to run services from Paris to Strasbourg, London and Brussels.[117]

Renfe[]

File:Talgo 350.jpg

Spanish AVE train

Spanish railway operator RENFE has also shown an interest in running AVE services from Spain to London[118] via Paris, Lyon, Barcelona, Madrid and Lisbon (using the Madrid–Barcelona high-speed rail line) once its AVE network is connected to France via the Barcelona to Figueras and Perpignan to Figueras lines in 2012.[119]

Transmanche Metro[]

In February 2010, local councillors from Kent and Pas-de-Calais announced they were in talks to establish a frequent local rail service between the regional stations along the route. Trains would leave Lille and stop at Calais, Ashford and Stratford before reaching London St. Pancras. Currently, Ashford and Calais have an infrequent service and Eurostar trains do not call at Stratford. The initiative is part of Calais' branding as part of the UK in order to benefit from the 2012 London Olympics but is supported on both sides of the channel to bring in more commuters.[120]

China[]

In March 2010 China Railway High-speed (CRH) announced a plan to link London, Beijing and Singapore via a series of high-speed lines. London to Beijing trains could take two days to complete the 5,070-mile journey via 17 countries, while London-Singapore, 6,750 miles, would take three days.[121]

See also[]

References[]

  1. HS1 report on Freight (June 2009). Retrieved on 5 October 2010.
  2. Freight trains set to use High Speed 1. highspeed1.co.uk (16 April 2009). Retrieved on 7 July 2009.
  3. Channel Tunnel Rail Link Visit. Institute of Sound and Vibration Research, University of Southampton. Retrieved on 6 July 2009. “Section 2, which has a line speed of 230 km/h”
  4. Template:Cite news[dead link]
  5. Paris - London High Speed 1 (CTRL). High Speed: TVM. Ansaldo STS. Retrieved on 4 February 2010.
  6. 6.0 6.1 6.2 HS1 Network Statement 17,19. HS1 Limited (17 August 2009). “3.3.1.2 Track Gauge & Structure Gauge: The nominal track gauge is 1435mm. ... 3.3.2.1 Loading Gauge: ... UIC "GC" on HS1; and UIC "GB+" on Ashford connecting lines ... Waterloo connection .. structure gauge (W6/W6A)”
  7. High Speed One - and Only. RailStaff (14 November 2006). Retrieved on 14 November 2006.
  8. High Speed 1. railway-technology.com (23 December 2008). Retrieved on 23 December 2008.
  9. Template:Cite press release
  10. Southeastern Highspeed. Southeastern Railway (1 December 2009). Retrieved on 1 December 2009.[dead link]
  11. Template:Cite news
  12. Matthews, Roger (2003). The archaeology of Mesopotamia: theories and approaches. Routledge, 31. ISBN 0-415253-17-9. “The development of this new railway resulted in the largest archaeological project to date in the United Kingdom” 
  13. Template:Cite news
  14. Template:Cite news
  15. 15.0 15.1 Template:Cite news
  16. Bilan LOTI de la LGV Nord Rapport (French). Cgedd Developpement. Retrieved on 10 May 2009.
  17. Template:Cite press release
  18. Detailed map layout of Belgian railway transportation network. Infrabel. Retrieved on 13 May 2009.
  19. Template:Cite news
  20. How the need for a CTRL developed. Department for Transport. Retrieved on 1 August 2009.
  21. Template:Cite news
  22. 22.0 22.1 Channel Tunnel Rail Link Act 1996 c61 (1996). Retrieved on 11 February 2010.
  23. Channel Tunnel Rail Link (Supplementary Provisions) Act 2008 c5 (2008). Retrieved on 11 February 2010.
  24. HC Hansard Volume 467 Part 3 Column 259. Hansard. Parliament of the United Kingdom (8 November 2007). Retrieved on 31 August 2008.
  25. 25.0 25.1 Template:Cite news
  26. Template:Cite news
  27. Template:Cite news Template:Subscription
  28. Template:Cite news
  29. Template:Cite news
  30. Channel Tunnel Oral Answers to Questions: Transport, House of Commons debates. theyworkforyou dot com (23 April 1990).
  31. The Channel Tunnel Rail Link: Report by the Controller and Auditor General. National Audit Office. Retrieved on 1 August 2009.
  32. Template:Cite press release
  33. About St Pancras. stpancras.com. Retrieved on 9 July 2009.
  34. Template:Cite news
  35. Template:Cite news
  36. Template:Cite news
  37. Template:Cite news
  38. Template:Cite news
  39. Template:Cite news
  40. Template:Cite news
  41. 41.0 41.1 LCR rejects takeover bid. RailStaff (31 March 2006). Retrieved on 15 November 2006.
  42. Template:Cite news
  43. Owen, Ed (8 June 2009). Government takes control of London and Continental. New Civil Engineer. Retrieved on 16 February 2010.
  44. Template:Cite news
  45. Template:Citeweb
  46. Template:Cite news
  47. 47.0 47.1 Template:Cite news
  48. Template:Cite news
  49. Template:Cite news
  50. Case study: Channel Tunnel Rail Link. New Civil Engineer (22 February 2001). Retrieved on 1 August 2009.
  51. Template:Cite news
  52. Railway Herald on-line magazine, Issue 75 (9 March 2007). Retrieved on 9 February 2010.
  53. 53.0 53.1 Eurostar Press Release, "Eurostar celebrates 10 years at Ashford International"
  54. Template:Cite news
  55. RailEurope. save-eurostar.org. Retrieved on 14 May 2009.
  56. Template:Cite news
  57. Save Ashford International (retrieved from archive.org). www.saveashfordinternational.org.uk. Archived from the original on 12 April 2008. Retrieved on 18 February 2008.
  58. 58.0 58.1 Preview timetable. Southeastern Railways. Retrieved on 1 June 2009.[dead link]
  59. Official name of the station according to the Department of Transport, released in response to a Freedom of Information Act request at Whatdotheyknow.com. Retrieved 2 December 2008.
  60. Official name of the station according to the London Borough of Camden released in response to a Freedom of Information Act request at Whatdotheyknow.com. Retrieved 2 December 2008.
  61. Template:Cite news
  62. Template:Cite news
  63. Template:Cite news
  64. Southeastern Highspeed. Southeastern (1 December 2009). Retrieved on 1 December 2009.[dead link]
  65. Template:Cite news
  66. Template:Cite news
  67. Strategic Freight Network: The Longer-Term Vision. Department for Transport. Retrieved on 17 May 2009. “20.5 European freight link (UIC GB+ Gauge): A European loading gauge freight link has been secured as far as Barking through Channel Tunnel”
  68. Eurostar Revamps High-Speed Service (15 October 2007). Retrieved on 11 February 2010.
  69. Britons protest tunnel rail routes. St. Petersburg Times (27 February 1989).
  70. Template:Cite news
  71. High Speed 1 Section 2 Major Contracts - Descriptions. High Speed 1. Archived from the original on 27 November 2007. Retrieved on 11 February 2010.
  72. The regeneration benefits of the CTRL. Department for Transport. Retrieved on 1 August 2009.
  73. Template:Cite news
  74. Template:Cite news
  75. New Statesman Special Report - Coming soon: the Dome on wheels. New Statesman. Retrieved on 28 April 2009.
  76. Template:Cite news
  77. Template:Cite news
  78. Template:Cite news
  79. Template:Cite news
  80. Template:Cite news
  81. Template:Cite news
  82. Our history. Eurotunnel. Retrieved on 10 May 2009.
  83. Official Waterloo 'Goodbye' video, useful statistics and numbers shown
  84. Template:Cite press release
  85. Template:Cite document
  86. Template:Cite press release
  87. Template:Cite news
  88. Template:Cite news
  89. Template:Cite news
  90. South Eastern Trains Times. Southeastern. Retrieved on 5 November 2009.[dead link]
  91. South Eastern Trains Times (11:53 CX arrives 12:53). Southeastern (11 May 2009). Retrieved on 5 November 2009.[dead link]
  92. Full speed ahead at St Pancras International Station. London2012. Archived from the original on 5 September 2012. Retrieved on 23 June 2009.
  93. Template:Cite news
  94. Template:Cite news
  95. Southeastern: Highspeed services reach Ramsgate and Dover. Southeastern (13 August 2009). Retrieved on 18 August 2009.[dead link]
  96. Transportation and Logistics in the DB Group. DB Schenker. Retrieved on 7 July 2009.
  97. Eurostar Revamps High-Speed Service. Railway Technology. Retrieved on 7 July 2009.
  98. 98.0 98.1 Freight trains to use High Speed 1 from 2010. Railway Gazette International (16 April 2009). Retrieved on 7 July 2009.[dead link]
  99. Eurotunnel may bid for HS1 rail link. International Freighting Weekly (10 July 2009). Retrieved on 1 August 2009.
  100. Template:Cite news
  101. Template:Cite news
  102. Template:Cite news
  103. Template:Cite news
  104. Template:Cite news
  105. London & Continental Railways - scroll down to section "About the future".
  106. Template:Cite news
  107. Template:Cite news
  108. Template:Cite news
  109. Template:Cite news
  110. Template:Cite news
  111. 111.0 111.1 Template:Cite news
  112. Template:Cite news
  113. Template:Cite news
  114. Template:Cite news
  115. Template:Cite news
  116. Template:Cite news
  117. "Veoila and Trenitalia mount rival Eurostar service", Breaking Travel News, 24 December 2009.
  118. Template:Cite news
  119. Template:Cite news
  120. Template:Cite news
  121. Template:Cite news

Bibliography[]

  • Young, George (1995). Channel Tunnel Rail Link. Union Railways. 
  • National Audit Office (2001). Department of the Environment, Transport and the Regions: The Channel Tunnel Rail Link. The Stationery Office. ISBN 0102868018. 
  • National Audit Office (2005). Progress on the Channel Tunnel Rail Link. The Stationery Office. ISBN 010293343X. 
  • Montagu, Samuel (1993). Channel Tunnel Rail Link. HMSO. 
  • Bertolini, Luca (1998). Cities on rails: the redevelopment of railway station areas. Taylor & Francis. ISBN 0419227601. 

Further reading[]

  • Pielow, Simon (1997). Eurostar. Ian Allan. ISBN 071102-451-0. 
  • Anderson, Graham; Roskrow, Ben (1994). The Channel Tunnel Story. London: E & F N Spon. ISBN 041919620X. 
  • European Commission Directorate-General for Regional Policy and Cohesion (1996). The regional impact of the Channel Tunnel throughout the Community. Luxembourg: European Commission. ISBN 92 826 8804 6. 
  • Sievert, Terri (2002). The World's Fastest Trains. Capstone Press. ISBN 073681-061-7. 
  • Griffiths, Jeanne (1995). London to Paris in Ten Minutes: The Eurostar Story. Images. ISBN 189781-747-9. 
  • Comfort, Nicholas (2007). The Channel Tunnel and its High Speed Links. Oakwood Press. ISBN 156554-854-x. 
  • Parliament: House of Commons Transport Committee (2008). Delivering a Sustainable Railway. The Stationery Office. ISBN 021552-222-2. 
  • Mitchell, Vic (1996). Ashford: From Steam to Eurostar. Middleton Press. ISBN 187379-367-7. 

External links[]

Template:Commonscat

Template:TGV navbox Template:Eurostar navbox Template:Channel tunnel Template:High-speed railway lines Template:Main inter-regional railway lines in Great Britain Template:Railway lines in London Template:Railway lines in the East of England

ca:High Speed 1 de:High Speed One es:High Speed 1 fr:High Speed 1 hu:CTRL nl:Channel Tunnel Rail Link ja:CTRL pl:High Speed 1 ro:High Speed 1 fi:High Speed 1

Advertisement