FANDOM


Jubilee
Colour on map Grey
Year opened 1979
Line type Deep Level
Rolling stock 1996 Tube Stock
7 carriages per trainset
Stations served 27
Length (km) {{{LengthKm}}}
Length (miles) {{{LengthMiles}}}
Depots Neasden, Stratford Market[1]
Journeys made 127,584,000 (per annum)
Rail lines of
Transport for London
London Underground lines
  Bakerloo
  Central
  Circle
  District
  Hammersmith & City
  Jubilee
  Metropolitan
  Northern
  Piccadilly
  Victoria
  Waterloo & City
Other lines
  Docklands Light Railway
  Tramlink
  Overground

The Jubilee line is a line on the London Underground ("the Tube"), in the United Kingdom. It was built in two major sections - initially to Charing Cross in Central London, and later extended in 1999 to Stratford in east London. The later stations are notable for their larger size and safety features (both being attempts to future proof the line). Out of 27 stations served, 13 are below ground.

The Jubilee line is coloured silver/grey on the Tube map.

Up to 1939Edit

In 1932, the Metropolitan Railway built a branch from its main line at Wembley Park to Stanmore. The line, as with many others in the north-west London area, was designed to absorb commuter traffic from the new and rapidly expanding suburbs. The line presented the Metropolitan with a problem — so successful was the suburban traffic that by the early 1930s, the lines into Baker Street were becoming overloaded, a problem which was exacerbated by the post-war flight from the City of London to the West End of London.

At first the Metropolitan had advocated a new underground line roughly following the line of the Edgware Road between the tube station and a point near Willesden Green. Indeed, construction advanced as far as the rebuilding of Edgware Road station to accommodate 4 platforms of 8 car length. Things changed though with the formation of the London Passenger Transport Board (LPTB) and the subsequent absorption of the Metropolitan. The solution was now an extension of the Bakerloo line from Baker Street to serve St John's Wood and Swiss Cottage, thereby rendering the existing stations of Lord's, Marlborough Road and Swiss Cottage on the parallel route redundant, and negating the need for the Met's extension from Edgware Road station (it should be noted, however, that Swiss Cottage Met was proposed to remain open during peak hours for interchange with the Bakerloo, and that Lord's station would further open for special cricketing events. In the event, both closed permanently as war time economies). The line would rise between the Metropolitan tracks at Finchley Road, providing cross-platform interchange with the Metropolitan line. Continuing north to Wembley Park, the Bakerloo was to provide intermediate service on the Metropolitan line, allowing Metropolitan line trains to run Wembley Park to Finchley Road non-stop, cutting seven minutes from journey times. At Wembley Park, the Bakerloo would run on to serve Kingsbury, Queensbury, Canons Park and Stanmore. The Bakerloo extension, built as above, opened in 1939.

1939 to 1979, the Fleet lineEdit

The immediately pre- and post-war planning for the Tube network considered a series of new routes. The main results of this study concerned two major routes: the south to north-east "line C" (later constructed as the Victoria line) and lines 3 and 4, new cross-town routes, linking the north-east suburbs to Fenchurch Street, Wapping and variously Lewisham and Hayes.

The Fleet line was mentioned in a 1965 Times article, discussing options after the Victoria line had been completed — suggesting that the Fleet line could take a Baker Street—Bond Street—Trafalgar Square—Strand—Fleet Street—Ludgate Circus—Cannon Street route, then proceeding into south-east London.[2]

Line C opened as the Victoria line, in stages, between 1968 and 1972. Work on the north-east - south-west route continued.

In 1971 construction began on the new 'Fleet line'. Economic pressures, and doubt over the final destination of the line, had led to a staged approach. Under the first stage, the Baker Street to Stanmore branch of the Bakerloo line was joined at Baker Street to a new Template:Convert/mi segment into central London, with intermediate stops at Bond Street and Green Park and terminating at a new station at Charing Cross, thereby relieving pressure on the West End section of the Bakerloo line between Baker Street and Charing Cross and also allowing increased frequencies on the section north of Baker Street.

The new tube was to offer cross-platform interchange between the Bakerloo and Fleet at Baker Street, as pioneered on the Victoria line. The work was completed in 1979. As part of the works, Trafalgar Square (Bakerloo) and Strand (Northern) stations were combined into a single station complex, Charing Cross. The existing Charing Cross station on the sub-surface District and Circle lines was renamed Embankment.

The new line was to have been called the Fleet line[3] after the River Fleet (although it would have only crossed under the Fleet at Ludgate Circus; the Central London section mostly follows the Tyburn). In 1975 when plans were underway to introduce the London Transport Silver Jubilee Bus fleet, the then Sales Manager of London Transport Advertising proposed to the Chairman of LTE, Rt Hon Kenneth Robinson PC, that the Fleet line should be renamed the Jubilee line. However, this idea was rejected due to the additional costs involved. Nevertheless, the project was subsequently renamed the Jubilee line for Queen Elizabeth II's 1977 Silver Jubilee following a pledge made by the Conservatives in the Greater London Council election of 1977. The original choice of battleship grey for the line's colour was based on the naval meaning of the word fleet; this became a lighter grey, representing the silver colour of the Jubilee itself.

The line was officially opened by the Prince of Wales on 30 April 1979, with passenger services operating from 1 May 1979.[4][5]

1979 to 1999Edit

The Jubilee line of 1979 was to be the first of four phases of the project, but lack of funds meant that no further progress was made until the late 1990s.

  • Phase 3 would have seen the line continue under the river to Surrey Docks (now Surrey Quays on the East London Railway tube station with a branch to both Lewisham via New Cross, and to New Cross Gate Station.
  • Phase 4 was the possible continuation of the Lewisham branch to take over suburban services on the Addiscombe and Hayes (Bromley) Branch.

An alternative plan was devised in the 1970s to extend the Jubilee line parallel to the River Thames: this would have taken the line from Fenchurch Street to Thamesmead via St Katharine Docks, Wapping, Surrey Docks North, Millwall (near to South Quay Docklands Light Railway station, North Greenwich, Custom House, Silvertown, Woolwich Arsenal, thence to Thamesmead. The depot would have been at Beckton, roughly on the site of the current Docklands Light Railway Depot. However the 'River line', as this extension was called, was deemed too expensive and construction of the extension never proceeded.

Changes in land use, particularly the urban renewal of the Docklands area, caused the project to extend the line beyond Charing Cross to change considerably in the 1970s, 1980s and 1990s. The Jubilee Line Extension, as the eventual project became known, opened in three stages in 1999. It split from the existing line at Green Park creating a one-station branch to Charing Cross, which is now closed (although it is still maintained for reversing trains at times of disruption, and for occasional use as a film set). The line extends as far as Stratford, with ten intermediate stations.

There have been other proposals to extend the line serving the docks.[6]

7th Car Upgrade Edit

The Jubilee line closed for a scheduled five-day period starting on 26 December 2005 in order to add an extra car to each of the six-car trains.[7] The line had to be closed while this work was done as six and seven car trains could not run in service at the same time because the platform edge doors at Jubilee Line Extension stations could not cater for both train lengths simultaneously. Additionally, an extra four complete trains were added to the fleet, bringing the total to 63. The result is a 17% increase in capacity at peak times, allowing 6,000 more passengers per day to use Jubilee line services. The signalling system was also upgraded. Work was completed and the line reopened two days ahead of schedule, on 29 December 2005.

Current Jubilee line Edit

The Jubilee line is the newest line of the London Underground network. The trains were upgraded in 1997 to the 1996 stock.

Station features Edit

Stations on the Jubilee Line Extension feature:

  • step free access to street level
  • state-of-the-art architecture
  • wheelchair access
  • Platform Edge Doors

The platform edge doors were primarily introduced to prevent unpleasant draughts underground and to assist in air flow. They also prevent people from falling or jumping on the track.

Against these improved features, the Jubilee Line Extension stations have been heavily criticised for very longwinded and poorly planned (although expensive to build) connection facilities with other Underground lines, compared for example to the Victoria line, the previous cross-London line built. However the opportunity for convenient interchange simply was not present due to alignment issues and the larger running tunnels. The more extensive stations do have the benefit of being able to accommodate the crowds that sometimes build up and do mean that the line is expected to be fit for purpose for many years to come whereas other lines (notably the Victoria line at Victoria) now require extensive remedial schemes to rectify this.

Rolling stock Edit

File:1996 stock driver car.png
File:1996 stock trailer car.png
File:LUL 1996 Tube Stock at Stratford.jpg

When the Jubilee line was opened, it was operated by 1972 stock. In 1984 this was partially replaced by the new 1983 stock, the displaced 1972 stock being transferred to the Bakerloo line. The 1983 stock proved to be unreliable and troublesome in service,[citation needed] with single-leaf doors making passenger loading and unloading a slower process than on other stock with wider door openings. With the construction of the Jubilee line Extension, the opportunity was taken to introduce new trains, and today the line is worked by 1996 stock, which has an exterior similar to the 1995 stock in use on the Northern line but (in spite of the confusing naming) is technically less advanced. The new rolling stock has internal displays and automated announcements to provide passengers with information on the train's route - at first they simply listed the destination of the train, and subsequently also listing the name of the next station and interchanges there. The 1996 stock uses a different motor to the 1995 stock and has a motor design similar to Class 465 Networker trains. Subsequent modifications also made the text scroll across the internal display instead of just appear in it.

Future Edit

Line Upgrade Edit

A project is currently under way to convert the Jubilee line to automatic train operation, using the SelTrac system in use on the Docklands Light Railway.[8] When complete, the new system will enable London Underground to run more trains, increase capacity by 33 per cent and to cut journey times by around 22 percent.[9] Equipment installation and testing for the new systems began in late 2006, and the line upgrade work has required the closure of sections of the Jubilee line on each weekend during 2009. Although the project was due for completion in March 2009, the Jubilee line closures are to continue into 2010[10]. A revised completion date of Easter 2010 has been missed, with closures continuing until October 2010 at the earliest, leaving the project at least 17 months behind schedule.[11] Transport for London reported on 4 November 2010 that the upgrade will now be finished by Spring 2011. These delays are due to Tube Lines not meeting their deadlines, and when TfL took it over in June 2010, it realised how much work still had to be done. The new signalling system will be delivered first between Stratford and Westminster, and soon after between Westminster and Stanmore. The first stage of resignalling has been completed and in use between Waterloo and Statford but only during weekends. The on-train computer instructs what the train-operator has to do. This system is called TBTC, which stands for Transmission-Based Train Control. Previous testings of TBTC have failed or mal-functioned, but it is hoped that the problems will be rectified before January 2011. Full ATO, with the computer doing everything except opening and closing the doors, starting the train at every station, mending faults and dealing with passengers will be in operation by Spring 2011. After that, TBTC will be the back-up system should ATO fail. If both systems fail, the train would be put into Restricted Manual mode, which means that the train operator can drive the train 5-10mph to the next station where the train would then be out of service until the fault is mended by engineers. This type of fault cannot be fixed by the train-operator. The reason for the delays in completing the upgrade is obviously partly due to Tube Lines' bad organisation, but also because TfL want to keep testing the new systems on every train until they all function properly, which takes time. Engineers are also being transferred to the Northern line for its upgrade, which should have started just after the original proposed completion date of the Jubilee line upgrade, in March 2009. This is because the upgrades for the Jubilee, Northern and Piccadilly lines are all part of a rolling timetable using the same engineers: Jubilee, Northern part 1, Piccadilly Northern part 2. Unless TfL bring in many extra engineers (which they have finally began to do) all four upgrades for the three lines would be subject to severe delays.[12]

The programme of closures has been criticised by local politicians[13], as well as by the management of venues such as Wembley Stadium and The O2 because visitors to major concerts and sporting events have had to travel by rail replacement bus.[10][14] The management of the project by Tube Lines has been criticised by London TravelWatch for its delayed delivery date,[15] and a report by the London Assembly referred to the weekly line closures as "chaotic".[16][17]

Thamesmead branchEdit

When North Greenwich was opened, it was constructed to enable a branch extension to be built eastwards to Thamesmead. At present there are no plans to construct this branch route.

West Hampstead InterchangeEdit

Plans were put forward in 1974 and again in 2004 for a West Hampstead interchange, to connect the three West Hampstead stations in one complex, but plans were put on hold in 2007 due to uncertainty over the North London Line rail franchise.[18]

Map Edit

Stations Edit

Template:Jubilee Line

File:Step-free access notification (Jubilee line).png
Station Image Opened Additional information
Stanmore Handicapped/disabled access 50px 10 December 1932 map 1
Canons Park 50px 10 December 1932 Opened as Canons Park (Edgware); renamed 1933map 2
Queensbury 50px 16 December 1934 map 3
Kingsbury Handicapped/disabled access 50px 10 December 1932 map 4
Wembley Park Handicapped/disabled access 50px 14 October 1893 Change for the Metropolitan Linemap 5
Neasden* 50px 2 August 1880 map 6
Dollis Hill* 50px 1 October 1909 map 7
Willesden Green* 50px 24 November 1879 map 8
Kilburn* Handicapped/disabled access 50px 24 November 1879 Opened as Kilburn & Brondesbury; renamed 25 September 1950map 9
West Hampstead* 12px 10px 50px 30 June 1879 map 10
Finchley Road File:Finchley Road Tube.jpg 30 June 1879 Change for the Metropolitan Linemap 11
Swiss Cottage 50px 20 November 1939 map 12
St John's Wood 50px 20 November 1939 map 13
Baker Street 50px 1 May 1979 Change for the Bakerloo, Circle, Hammersmith & City, and Metropolitan Linesmap 14
Bond Street 50px 1 May 1979 Change for the Central Linemap 15
Green Park 50px 1 May 1979 Change for the Piccadilly and Victoria Linesmap 16
Westminster Handicapped/disabled access 50px 22 December 1999 Change for the Circle and District Linesmap 17
Waterloo 12px Handicapped/disabled access 50px 24 September 1999 Change for the Bakerloo, Northern and Waterloo & City Linesmap 18
Southwark (12px Waterloo East) Handicapped/disabled access 50px 20 November 1999 map 19
London Bridge 12px (10px Trains to Gatwick) Handicapped/disabled access 50px 7 October 1999 Change for the Northern Linemap 20
Bermondsey Handicapped/disabled access 50px 17 September 1999 map 21
Canada Water Handicapped/disabled access 50px 17 September 1999 Change for the London Overground East London Line map 22
Canary Wharf 10px Handicapped/disabled access 50px 17 September 1999 Change for the Docklands Light Railwaymap 23
North Greenwich Handicapped/disabled access 50px 14 May 1999 map 24
Canning Town 10px Handicapped/disabled access 50px 14 May 1999 Change for the Docklands Light Railway map 25
West Ham 12px Handicapped/disabled access 50px 14 May 1999 Change for the District and Hammersmith & City lines, and Docklands Light Railwaymap 26
Stratford 12px 10px 10px Handicapped/disabled access 50px 14 May 1999 Change for the Central Line, the London Overground North London Line, and Docklands Light Railwaymap 27
* - Between Finchley Road and Wembley Park, the Jubilee line right of way widens to four tracks. Jubilee line trains run on the two inner tracks. Flanking the Jubilee line are tracks used by the Metropolitan line. Metropolitan line trains run non-stop from Finchley Road to Wembley Park, skipping West Hampstead, Kilburn, Willesden Green, Dollis Hill, and Neasden stations. Willesden Green and Neasden stations have platforms on the Metropolitan line tracks, but Met trains only stop here during emergencies, or when there are major operating issues with either the Metropolitan and/or Jubilee lines.

Former stationsEdit

Station Opened Closed
Charing Cross 1 May 1979 19 November 1999

The Jubilee line platforms at Charing Cross are still used but not for passengers - when the service is suspended between North Greenwich/Canary Wharf and Stratford, one in every three trains will terminate at Green Park, go to Charing Cross, reverse, and start a service from Green Park. The old Charing Cross station is a popular set for films.

DepotsEdit

The Jubilee line is currently served by two depots, Neasden Depotmap 28 located between the Neasden and Wembley Park Stations and Stratford Market Depotmap 29 between the Stratford and West Ham stations.[1]

GalleryEdit

Template:Gallery

Additional images are available from the Commission for Architecture and the Built Environment (CABE) case studies for the stations at Canary Wharf,[19] North Greenwich,[20] Southwark,[21] and Stratford.[22]

MapsEdit

See alsoEdit

ReferencesEdit

  1. 1.0 1.1 London Underground Key Facts. Transport for London. Retrieved on 2008-05-21.
  2. Template:Cite news
  3. Willis, Jon (1994). Extending the Jubilee Line: The Planning Story. London Transport. 
  4. Jubilee Line, Dates. Clive's Underground Line Guides. Retrieved on 2008-02-12.
  5. Rose, Douglas (1999). The London Underground, A Diagrammatic History. Douglas Rose/Capital Transport. ISBN 1-85414-219-4. 
  6. LDDC
  7. Travel advice for the festive season. TFL (19 December 2005). Retrieved on 9 March 2010.[dead link]
  8. Template:Cite news
  9. Transforming the Jubilee line. TfL (2009). Retrieved on 1 December 2009.
  10. 10.0 10.1 Template:Cite news
  11. Template:Cite news
  12. http://www.bbc.co.uk/news/uk-england-london-11695450
  13. Forham, Ed (19 August 2009). Don't close our community off at the weekends, please. Retrieved on 4 December 2009.
  14. Template:Cite news
  15. Comment on Jubilee Line delays. London TravelWatch. Retrieved on 1 December 2009.
  16. Template:Cite news
  17. Too close for comfort: Passengers' experiences of the London Underground. London Assembly Transport Committee (December 2009). Retrieved on 4 December 2009.[dead link]
  18. Station interchange plans put on hold. Camden New Journal (2007-03-15). Retrieved on 2008-07-29.
  19. Canary Wharf Underground Station. Commission for Architecture and the Built Environment (CABE). Retrieved on 2008-03-01.
  20. North Greenwich Underground Station. Commission for Architecture and the Built Environment (CABE). Retrieved on 2008-03-01.
  21. Southwark Underground Station. Commission for Architecture and the Built Environment (CABE). Retrieved on 2008-03-01.
  22. Stratford Station. Commission for Architecture and the Built Environment (CABE). Retrieved on 2008-03-01.

External linksEdit

Template:Commons category

West: Crossings of the River Thames East:
Westminster Bridge Between Westminster
and Waterloo
Bakerloo line
between Embankment
and Waterloo
Rotherhithe Tunnel Between Canada Water
and Canary Wharf
Greenwich foot tunnel
Docklands Light Railway
between Island Gardens
and Cutty Sark
Between Canary Wharf
and North Greenwich
Blackwall Tunnels
Blackwall Tunnels Between North Greenwich
and Canning Town
Thames Barrier
ca:Jubilee Line

cs:Jubilee Line (linka metra v Londýně) da:Jubilee line de:Jubilee Line es:Jubilee Line fr:Jubilee line gan:酒比利線 ko:주빌리 선 hi:जूबिली लाइन it:Jubilee Line ka:საიუბილეო ხაზი hu:Jubilee line nl:Jubilee Line ja:ジュビリー線 no:Jubilee-linjen nn:Jubilee-linja pl:Jubilee Line pt:Jubilee line ro:Jubilee line simple:Jubilee line sk:Jubilee Line sr:Џубили линија fi:Jubilee Line sv:Jubilee line th:สายจูบิลี

zh:朱比利線

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.