UK Transport Wiki
Register
Advertisement
Marshlink Line
Template:Px

The Marshlink Line, shown with other railway lines in Kent.

Overview
TypeHeavy rail
SystemNational Rail
StatusOperational
LocaleKent
East Sussex
South East England
TerminiAshford International
Hastings
Stations9
Websitehttp://www.southernrailway.com
Operation
Opened13 February 1851
OwnerNetwork Rail
Operator(s)Southeastern
Southern
CharacterRural
Rolling stockTemplate:BRC "Turbostar"
Template:BRC "Electrostar"
Template:BRC "Electrostar"
Technical
No. of tracks1-2
Track gauge{{#switch:sg
|3mm=3 mm (0.118 in)
|4mm=4 mm (0.157 in)
|4.5mm=4.5 mm (0.177 in)
|4.8mm=4.8 mm (0.189 in)
|6.5mm=6.5 mm (0.256 in)
|6.53mm=6.53 mm (0.257 in)
|8mm=8 mm (0.315 in)
|8.97mm=8.97 mm (0.353 in)
|9mm=9 mm (0.354 in)
|9.42mm=9.42 mm (0.371 in)
|10.5mm=10.5 mm (0.413 in)
|11.94mm=11.94 mm (0.470 in)
|12mm=12 mm (0.472 in)
|12.7mm=12.7 mm (0.5 in)
|13mm=13 mm (0.512 in)
|13.5mm=13.5 mm (0.531 in)
|14mm=14 mm (0.551 in)
|14.125mm=14.125 mm (0.556 in)
|14.2mm=14.2 mm (0.559 in)
|14.28mm=14.28 mm (0.562 in)
|14.3mm=14.3 mm (0.563 in)
|15.76mm=15.76 mm (0.620 in)

Template:Primary sources

Template:Marshlink Line RDT

The Marshlink Line is the name given to services on the railway line linking Ashford with Hastings in the South East of England. The line was part of an original proposal by a company named the Brighton Lewes and Hastings Railway to extend its coast route to Hastings. The South Eastern Railway eventually built the line, thereby renewing a local rivalry between itself and the London, Brighton and South Coast Railway (LB&SCR) the line was opened on 13 February 1851. Recommended for closure by Dr. Beeching in 1963, the route has survived various attempts to axe services completely, and stations remained unmodernised and gas-lit well into the 1970s.

The line was single tracked between Appledore and Ore on 1 October 1979, leaving a passing loop at Rye.[1] Linespeed was reduced from 85 mph to 60 mph, but there are additional long term speed restrictions in place, including a 20 mph speed restriction on the downline south of Ashford due to a subsiding embankment, 20 mph across an ungated level crossing at Winchelsea, and 40 mph between Doleham and Ore.

Ham Street, Appledore and Rye have staggered platforms: passengers cross the line from the end of one platform to the end of the other.

The line is not electrified, with the exception of Hastings to Ore.[2] This small section was electrified to provide for carriage sidings (there was no space at Hastings) as part of the "East Coastway" electrification of July 1935.

The line has an active rail users group called "The Marsh Link Action Group".[3]

Proposals have been made to upgrade and electrify the line to extend Southeastern high speed train services (which will operate from London via High Speed 1 to Ashford) onwards via the Marshlink to Hastings, Bexhill and Eastbourne, which if realised, could transform the line into an important through route.

The line was closed for nine weeks from January to March 2012 for essential repair work to Ore tunnel. There was also maintenance to signals and bridges to increase train speeds along the line.Cite error: Invalid <ref> tag; invalid names, e.g. too manyCite error: Invalid <ref> tag; invalid names, e.g. too many

Description of route[]

The stations on the route are listed below:

  • Ashford International
  • Ham Street: was Ham Street & Orlestone
  • Appledore: the station's formal name includes (Kent) in its title, although Appledore (Devon) station closed in 1917
    • Freight-only line diverges to serve Dungeness nuclear power station, operated by Direct Rail Services. The branch originally served both New Romney and Dungeness: there were stations at:
      • Brookland
      • Lydd Town
      • Lydd-on-Sea Halt
      • Greatstone-on-Sea Halt
      • New Romney
      • Dungeness was closed to passengers in 1937; and completely in 1953
    • all were closed to passengers on 6 March 1967
  • At Appledore the double line becomes single track
  • Rye
    • here there was, until 1962, the branch to Rye Harbour, opened in 1854
  • Winchelsea
  • Doleham
  • Three Oaks
  • Ore Tunnel [[[:Template:Convert/yd]]] [4]
  • here the line is doubled and electrified (originally for access to the carriage sidings at Ore but since removal of these sidings they are just used by service trains)
  • Ore
  • Mount Pleasant Tunnel [[[:Template:Convert/yd]]] [4]
  • Hastings

Passenger services[]

Passenger services are operated by Southern, as part of its East Coastway services. The line is no longer a separate part of the network. Trains run hourly between Ashford and Brighton, stopping at Ham Street, Appledore and Rye on the Marshlink Line with an additional shuttle at peak times. Three Oaks and Winchelsea stations are served by a two-hourly service in each direction, while Doleham is served by just three or four trains a day. Ore has separate hourly trains to Brighton and London.

Rolling stock[]

This line is one of the few in south-east England not to be electrified. Consequently, services are operated using Class 171 "Turbostar" DMUs.[2] These replaced the elderly Class 205 and Class 207 units in mid-2004. When Class 171 units are not available a class 201 diesel-electric unit (1001) owned by Hastings Diesels Ltd stands in. This unit has been fitted with central door locking so it can continue running services.

References[]

  1. 2.0 2.1 http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2010/Route%20A%20-%20Kent.pdf Network Rail Route Plan A 2010 Accessed 9 May 2012
  2. Marsh Link Action Group website Accessed 9 May 2012
  3. 4.0 4.1 Kent Rail's page on Ore station Accessed 9 May 2012

External links[]

Advertisement